The Guidelines for Planning in Bushfire Prone Areas have been updated.
The changes are outlined in the summary table at the front of the guidelines and include:
• ‘Minor development’ (as defined in State Planning Policy 3.7 Planning in Bushfire Prone Areas) in an area of BAL-40 or BAL-FZ is no longer a performance principle solution and does not require referral to the Department of Fire and Emergency Services (DFES)
• The minimum 20 metre requirement for an asset protection zone (APZ) has been removed with an APZ now needing to achieve BAL-29 or less
• The prescribed standards for vegetation within the APZ have been altered
• Acceptable solution A2.2 Hazard Separation Zone (HSZ) has been removed.